37.5 F
West Bend

Construction set to get underway at Mad Max

img_2371

Construction will begin this week as Mad Max/BP gas station in the 1200 block of S. Main Street in West Bend goes through a major reconstruction.

11025820_1556516547963974_638348838132553764_n

Plans for the gas station and convenience store call for reconfiguring the lot, razing the building, replacing the existing canopy and pumps, building a new convenience store and drive-thru and adding a total of 29 parking stalls. The former Clothes Clinic will also be razed.

 

Magestro owns several gas stations in West Bend including the Shell station in Barton, the BP station on Silverbrook and the station on Highway 33 and Meadowbrook Drive.

 

A note at the pump indicates the gas station on S. Main Street just south of Vine Street will close October 8 as construction gets underway.

 

American

Leave a Reply

Work or the content on WashingtonCountyInsider.com cannot be downloaded, printed, or copied. The work or content on WashingtonCountyInsider.com prohibits the end user to download, print, or otherwise distribute copies.

Subscribe

FREE local news at Washington County Insider on YouTube

Related Articles