39.3 F
West Bend

Meijer project the reason orange barrels on S. Main

MAIN STREET & PARKWAY DRIVE CLOSURE

IMG_5059-1

Street reconstruction work will be starting the week of July 18, 2016 on Main Street between Parkway Drive and Humar Street and on Parkway Drive in conjunction with the Meijer Store Development.

 

Rockford Construction of Grand Rapids, Michigan is the general contractor hired by Meijer for this project. There will also be a number of subcontractors working at various times throughout the project.

 

Street reconstruction work will generally consist of the widening of Main Street, construction of turn lanes on Main Street and Parkway Drive, traffic signal installation at the intersection of Main Street and Humar Street, and the construction of public sidewalk on Parkway Drive. The street reconstruction work is expected to be completed by the end of August, 2016.

 

Both Main Street and Parkway Drive will remain open to traffic with lane variations or temporary closures at times.

 

Motorists and pedestrians are asked to exercise caution, observe construction signs, obey flagmen, and be alert for heavy construction equipment while work is in progress. Alternate routes should be selected if possible.

If you have any questions about this news release, please contact the City’s Engineering Department at 262-335-5130.

Leave a Reply

Work or the content on WashingtonCountyInsider.com cannot be downloaded, printed, or copied. The work or content on WashingtonCountyInsider.com prohibits the end user to download, print, or otherwise distribute copies.

Subscribe

FREE local news at Washington County Insider on YouTube

Related Articles